Macro-scale C2 Process Mechanism: Revision and Application of Theory Model of PREA Loop
YANG Dongsheng1 LI Qiang2 LIU Yuchao3 ZHU Cheng4 XIU Baoxin5 ZHANG Weiming4 WANG Feiyue6
1. School of Public Management/Emergency Management(The Laboratory for Military-civilian Integration Emergency Command and Control), Jinan University, Guangzhou Guangdong 510632, China 2. Science and Technology Innovation Center of Army Research Institute, Beijing 100012, China 3. National Engineering Laboratory for Integrated Command and Dispatch Technology, Beijing 100192, China 4. The Key Laboratory for Information Systems Engineering, National University of Defense Technology, Changsha Hunan 410073, China 5. Prea Technologies Co.Ltd, Guangzhou Guangdong 510630, China 6. The State Key Laboratory for Management and Control of Complex Systems, Institute of Automation, Chinese Academy of Sciences, Beijing 100190, China
Abstract:The mechanism model of macro-scale command and control(C2)activity process description, the conceptual connotation of PREA loop is redefined from physical domains, information domains to cognitive domains. In physical domains, the evolutionary law of micro system is followed, four states of system are defined: design, construction, tunning and evaluation. In information domains, the process of gradually dissipating the fog of war is followed. Four kinds of situation are defined: inpredicatable deductive situation, predictable situation, real-time situation and retrospective situation. In cognitive domains the law of the gradual convergence of the decision-making of commander is followed, then four kinds of decision-making methods are established according to four situations: careful decision-making based on intention and deductive situation, prudent decision-making based on pre-plan and predictable situation, rapid decision-making based on rules and real-time situation, and effect-based conversion decision-making based on effects and retrospective situation. The connotation of the four stage of PREA are summarized including: stratagem, deployment, control and evaluation of situation. The comparative analysis of the PREA loop and the OODA loop is done, reflecting the two different thinking and philosophies of the East and the West. The PREA coop emphasizes the continuity and stability of the entirety, while the OODA loop emphasizes quickness and intervention.
阳东升,李强,刘玉超,朱承,修保新,张维明,王飞跃. 宏观尺度C2 过程机理:PREA环理论模型修订及应用[J]. 指挥与控制学报, 2022, 8(4): 389-401.
YANG Dongsheng,LI Qiang,LIU Yuchao,ZHU Cheng,XIU Baoxin,ZHANG Weiming,WANG Feiyue. Macro-scale C2 Process Mechanism: Revision and Application of Theory Model of PREA Loop. Journal of Command and Control, 2022, 8(4): 389-401.